In public. Datestamped. The next entry lands when something
worth saying happens.
ENTRY · 001
Design
Public site adopts the datasheet system.
The marketing site moves to a token-driven design system: Tailwind v4 with semantic tokens (color, type scale, spacing, accent), Geist Mono for every technical surface, system sans for editorial prose. Five base primitives + four schematic primitives ship together. Engineering drawing of HRN-001 lands as the hero element until the May 11–13 photography shoot.
Artifacts
THEME.md·/specs·/operator
ENTRY · 000
Process
Design freeze countdown begins.
Three days to design freeze. Branding still ahead of schedule on most fronts; one open decision blocks the storyboard for the launch film. We picked a later launch over a worse film as the operating principle.
Artifacts
Launch plan
ENTRY · …
──── ─ ──
Pending
First canonical entry lands at design freeze.
Hardware, firmware, integration, and process notes will
accumulate here from there.
Conventions
Entries are datestamped, terse, and concrete. Hardware photos and
schematic snippets accompany hardware entries. Firmware diffs cite
the commit. We try not to publish anything we wouldn't paste into
an internal Slack — if it isn't useful internally it isn't useful
here.